How much does a 4 bedroom building cost to construct in Homabay? 5 Key determinants.
Many people work so hard to raise enough money to build a house. Many people spend time researching how much does a 4 bedroom building cost to construct in Homabay while some go for how much does a 4 bedroom building cost to construct in Homabay. Just how much would it cost to build a house in Homabay?
In our experience as a construction company in Homabay, we have always tried to offer solutions to customers and even those making enquiries for planning purposes. The question should be, Is Ksh.XXX enough to build a 4 bedroom house in Homabay? So in this article, I want to tell how to get an answer to this question how much does a 4 bedroom building cost to construct in Homabay or how much does 4 bedroom building cost to construct in Homabay? I call them key determinants.
- How much do you have?
The answer to this question how much does a 4 bedroom building cost to construct in Homabay should be developed based on the available funds. Suppose you have Ksh.1, 000, 000, can this be enough for a four bedroom house in Homabay? Or can Ksh2.5M be enough to build a 4 bedroom house in Homabay?
In the construction world, it’s generally agreed that sections of a construction project take a certain percentage of the overall costs. For example,
Foundation to slab – 15%
Walls- 13%
Roofing (trusses, Mabati, gutters, labour & materials) – 21%
Doors & Windows- 11%
Finishing (plastering, tiling, painting, etc) – 25%
Interior fittings (closets, cabinets, kitchen, etc) – 4%
Plumbing fixing (sink, shower, taps, etc) – 5%
Electrification installation (sockets, switches, wiring, etc) – 6%
So with the amount at hand, someone is able to break down the money into sections and then you whether you can build a house with such money. With the help of a construction company or contractor, you will be able to understand.
- Location
In order to get an answer to this question how much does a 4 bedroom building cost to construct in Homabay you must understand the location where the project is supposed to take place. If you want to do the project in Nairobi, the cost of materials will vary and so is the cost of labour. Generally, its perceived that materials are fairer and cheaper around Nairobi than in the far counties of Homabay.
- Plinth area
The plinth area and carpet area of a building are measured for estimation and calculation of building cost. It is also a measure of the usable space of the building. The plinth area is the covered built-up area measured at the floor level of any storey or at the floor level of the basement. The plinth area is also called a built-up area and is the entire area occupied by the building including internal and external walls. The plinth area is generally 10-20% more than the carpet area.
How much does a 3 bedroom house cost to build in Narok? 5 Key determinants.
The bigger the plinth area, the more costly the project will be and vice versa. If you have enough money, you can have a bigger plinth area. A big plinth area means bigger rooms while a smaller plinth area means smaller rooms.
- Materials
The fourth determinant to the answer to this question, how much does a 4 bedroom building cost to construct in Homabay is the materials you use. If you use bricks, you will spend lesser than if you use stones or blocks.
- Source of Materials
Finally, to answer how much does a 4 bedroom building cost to construct in Homabay you must factor in where materials will come from. Most of the time, the source of materials will drive the construction cost because of transport elements.
Having said that, let’s look at an example. Suppose you have Ksh1.8M and you want to answer the question of how much does a 4 bedroom building cost to construct in Homabay you will decide the Ksh.1.8M as follows;
how much does a 4 bedroom building cost to construct in Homabay
PROJECT AMOUNT | 1,800,000 | |
SECTION | % | AMOUNT |
Foundation to Slab | 15% | 270,000 |
Walling | 13% | 234,000 |
Roofing | 21% | 378,000 |
Doors & Windows | 11% | 198,000 |
Finishing(plastering, tiling, painting, etc) | 25% | 450,000 |
Interior fittings(Closets, cabinets, kitchen, etc) | 4% | 72,000 |
Plumbing | 5% | 90,000 |
Electrical installation | 6% | 108,000 |
Total | 100% | 1,800,000 |
Your contractor can do calculations and see the size of the foundation which for example can be done at a cost of Ksh270, 000. There are areas where the foundation will be very expensive while in other areas, it will not be very expensive. In an area prone to be waterlogged, you will need a very powerful foundation.
Hopefully, this article helps you. For more information, if you need to build a house, talk to us. For any residential house-building services in Homabay, talk to us.
If you are looking for house designs in Kenya or a construction company in Kenya for your next project, think Marble Engineering and Construction Ltd.
We are a Design and Build Construction Company in Kenya with over 25 years of experience in active building construction in Kenya. We mainly do house plans, project planning, building construction, renovations and extensions, institutional building, commercial office blocks and plumbing and drainage services.